THE LONG RANGE TRANSPORTATION PLAN 

The Long Range Transportation Plan (LRTP) is a blueprint for maintaining and enhancing the regional transportation system. The LRTP identifies roadway, transit, bicycle and pedestrian, intelligent transportation systems (ITS), and other improvements needed over the next 25 years. Developing the LRTP is a collaborative effort between the public, local governments, and state and federal partners. Over the course of the study, the TPO will examine future transportation needs of the region and determine how to best address those needs. The LRTP includes a Needs Plan and a Cost Feasible Plan. The Needs Plan, as its name implies, is a plan that identifies all of the transportation projects necessary to meet future demands. The Needs Plan is reviewed and prioritized. The prioritized projects are included in the Cost Feasible Plan based on anticipated funding. Currently, forecasted revenues will not fund all identified projects.

For more information regarding the Bay County TPO Long Range Transportation Plan (LRTP), contact Gary Kramer at gary.kramer@ecrc.org. 

Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by SEQ in Ascending Order within category

2050 Long Range Transportation Plan12 documents

  • 2050 LRTP Scope of Work
    document seq 1.00
    Adopted April 24, 2024
  • 2050 LRTP Goals and Objectives Technical Report
    document seq 2.00
    Adopted February 5, 2025
  • 2050 LRTP Congestion Management Process Plan Technical Report
    document seq 3.00
    Adopted August 27, 2025
  • 2050 LRTP Evaluation Criteria Technical Report
    document seq 4.00
    Adopted August 27, 2025
  • 2050 LRTP Financial Resources Technical Report
    document seq 5.00
    Adopted August 27, 2025
  • 2050 LRTP Needs Plan Technical Report
    document seq 6.00
    Adopted February 25, 2026
  • 2050 LRTP Cost Feasible Plan Technical Report
    document seq 7.00
    Adopted May 27, 2026
  • 2050 LRTP Final Report
    document seq 7.00
    Finalized September 24, 2026
  • 2050 LRTP Summary Report
    document seq 8.00
    Finalized August 19, 2026
  • 2050 LRTP System Performance Report
    document seq 9.00
    Finalized June 8, 2026
  • 2050 Northwest Florida Regional Transportation Model Validation Report – FINAL
    document seq 10.00
  • 2050 Northwest Florida Regional Transportation Model Socioeconomic Data Report - FINAL
    document seq 10.00

2045 Long Range Transportation Plan13 documents

  • 2045 LRTP Scope of Services
    document seq 0.00
    Adopted July 2019
  • 2045 LRTP Goals and Objectives
    document seq 0.00
    Adopted February 2020
  • 2045 LRTP Financial Resources
    document seq 0.00
    Adopted May 2020
  • 2045 LRTP Evaluation Criteria
    document seq 0.00
    Adopted May 2020
  • 2045 LRTP Congestion Management Process Major Update
    document seq 0.00
    Adopted September 2020
  • 2045 LRTP Needs Plan
    document seq 0.00
    Adopted January 2021
  • 2045 LRTP Systems Performance Report
    document seq 0.00
    Finalized April 2021
  • 2045 LRTP Needs Plan Outreach Report
    document seq 0.00
    Finalized November 2020
  • 2045 LRTP Cost Feasible Plan
    document seq 0.00
    Adopted June 2021
  • 2045 LRTP Final Report
    document seq 0.00
    Finalized September 2021
  • 2045 Long Range Transportation Plan (LRTP) Summary Report
    document seq 0.00
    Finalized October 2021
  • FDOT Northwest Florida Regional Planning Model - 2015 Model Validation Report
    document seq 0.00
    Finalized September 2021
  • 2045 LRTP Modification Report #1
    document seq 0.00
    Approved June 2022

2040 Long Range Transportation Plan2 documents

  • Final Report (Adopted June 2016)
    document seq 0.00
  • 2040 Long Range Transportation Plan Summary Report
    document seq 0.00