BayTPOlogo (ECRC Colors)
 

Doc app

Document Center

The Document Center provides easy access to public documents. Click on one of the categories below to see related documents or use the search function.

Categories always sorted by seq (sub-categories sorted within each category)
Documents sorted by HEADER in Ascending Order within category

Plans and Documents68 documents

  • Air Quality Report
    document Header Air Quality Report
  • Annual Listing of Obligated Projects – FY 2024
    document Header Annual Listing of Obligated Projects – FY 2024
  • Bay County FY 2026-2030 Transportation Improvement Program (Adopted May 28, 2025)
    document Header Bay County FY 2026-2030 Transportation Improvement Program (Adopted May 28, 2025)
  • Bay UPWP FY 25 – FY 26 (May 2025)
    document Header Bay UPWP FY 25 – FY 26 (May 2025)
  • Bay_CMP_2024 Draft Minor Update
    document Header Bay_CMP_2024 Draft Minor Update
  • Bicycle and Pedestrian Master Plan
    document Header Bicycle and Pedestrian Master Plan
  • Boundaries and Apportionment Report
    document Header Boundaries and Apportionment Report
  • Bylaws
    document Header Bylaws
  • Comprehensive Operations Analysis Executive Summary
    document Header Comprehensive Operations Analysis Executive Summary
  • Congestion Management Process Plan (CMPP) Minor Update 2024
    document Header Congestion Management Process Plan (CMPP) Minor Update 2024
  • Draft Interlocal Agreement
    document Header Draft Interlocal Agreement
  • Efficient Transportation Decision Making
    document Header Efficient Transportation Decision Making
  • FY 2025-2029 Bay County Transportation Improvement Program (Amended May 28, 2025)
    document Header FY 2025-2029 Bay County Transportation Improvement Program (Amended May 28, 2025)
  • Intelligent Transportation Systems Plan
    document Header Intelligent Transportation Systems Plan
  • ITS Annual Progress Report
    document Header ITS Annual Progress Report
  • Parking Lot Site Plan
    document Header Parking Lot Site Plan
  • Public Participation Plan (Adopted, Feb. 2022)
    document Header Public Participation Plan (Adopted, Feb. 2022)
  • Regional Freight Network Plan
    document Header Regional Freight Network Plan
    Highways Of Commerce (Adopted April 28, 2010)
  • TPO Orientation Presentation
    document Header TPO Orientation Presentation

Public Transportation6 documents

  • 2022 April 27 Exhibit 1, LED Lighting Easement with FPL
    document Header 2022 April 27 Exhibit 1, LED Lighting Easement with FPL
  • 2022 Bus Wash Design Contract
    document Header 2022 Bus Wash Design Contract
  • 2022 Bus Wash System Proposal
    document Header 2022 Bus Wash System Proposal
  • 2022 Policies and Plans
    document Header 2022 Policies and Plans
  • Request for Qualifications (RFQ) Design and Construction Management of a New Bus Wash Facility
    document Header Request for Qualifications (RFQ) Design and Construction Management of a New Bus Wash Facility
  • Transit Development Plan Executive Summary
    document Header Transit Development Plan Executive Summary

Bayway11 documents

  • 2022 Bay Town Trolley Develop Strategic Plan
    document Header 2022 Bay Town Trolley Develop Strategic Plan
  • 2022 Bay Town Trolley Rebranding Attachment
    document Header 2022 Bay Town Trolley Rebranding Attachment
  • Advertising RFP
    document Header Advertising RFP
  • Bay Way TDP Annual Update
    document Header Bay Way TDP Annual Update
  • Draft Architectural-Engineering Contract
    document Header Draft Architectural-Engineering Contract
  • Draft Contract TPO 22-02, Transit Advertising Sales
    document Header Draft Contract TPO 22-02, Transit Advertising Sales
  • Fixed Route Operator RFP
    document Header Fixed Route Operator RFP
  • Invitation for Bid 23-01, Bus Wash Facility
    document Header Invitation for Bid 23-01, Bus Wash Facility
  • MLD Bus Wash Proposal, 1-4-23
    document Header MLD Bus Wash Proposal, 1-4-23
  • Procurement Process
    document Header Procurement Process
  • Safe Place Training Presentation
    document Header Safe Place Training Presentation

Bay County Transit Subcommittee2 documents

  • Architectural Services Contract
    document Header Architectural Services Contract
  • Bay Transit Title VI Policy and Plan
    document Header Bay Transit Title VI Policy and Plan

Project Priorities9 documents

FY 2027-2031 Project Priorities (Approved May 28, 2025)3 documents

  • FY 2027 - FY 2031 Bay County TPO Multi-Modal Project Priorities (Adopted) DOT Version
    document Header FY 2027 - FY 2031 Bay County TPO Multi-Modal Project Priorities (Adopted) DOT Version
  • FY 2027 - FY 2031 Bay County TPO Non-SIS, SIS, TSM, and TA Project Priorities (Adopted) DOT Version
    document Header FY 2027 - FY 2031 Bay County TPO Non-SIS, SIS, TSM, and TA Project Priorities (Adopted) DOT Version
  • FY 2027 - FY 2031 Bay County TPO Project Priorities
    document Header FY 2027 - FY 2031 Bay County TPO Project Priorities

TA Application Process (Current Cycle Due January 2025)3 documents

  • FDOT-TRIP-TA-Flyer.pdf
    document Header FDOT-TRIP-TA-Flyer.pdf
  • Transportation Alternatives (TA) Applications - FY 2027-2031 (January 2025)
    document Header Transportation Alternatives (TA) Applications - FY 2027-2031 (January 2025)
  • TRIP-TA-Notification
    document Header TRIP-TA-Notification

Transportation Alternatives (TA)32 documents

  • Bay TA Supplemental Guidelines
    document Header Bay TA Supplemental Guidelines
  • TPO Adopted TA Scoring Criteria
    document Header TPO Adopted TA Scoring Criteria

TA Application Process (Past Cycle Due January 2024)9 documents

  • AGENDA - Dec 2023 - Bay TPO TA Education Workshop
    document Header AGENDA - Dec 2023 - Bay TPO TA Education Workshop
  • FDOT TRIP TA Information Flyer
    document Header FDOT TRIP TA Information Flyer
  • FDOT TRIP TA Notification
    document Header FDOT TRIP TA Notification
  • Final Scoring - Bay Co Ormond Ave Multiuse Path
    document Header Final Scoring - Bay Co Ormond Ave Multiuse Path
  • Final Scoring - Panama City Multiuse Trail Phase 3
    document Header Final Scoring - Panama City Multiuse Trail Phase 3
  • Final Scoring - Panama City SR77 Sidewalks Stormwater
    document Header Final Scoring - Panama City SR77 Sidewalks Stormwater
  • TA Application - Bay Co Ormond Ave Multiuse Path
    document Header TA Application - Bay Co Ormond Ave Multiuse Path
  • TA Application - Panama City Multiuse Trail Phase 3
    document Header TA Application - Panama City Multiuse Trail Phase 3
  • TA Application - Panama City SR 77 Sidewalks Stormwater
    document Header TA Application - Panama City SR 77 Sidewalks Stormwater